Am I being too optimistic in thinking that hardware
Gremlins have been ironed out through the Dm41x and
Dm42 phases. So a Dm43 pre production should just
Be confirmation of what you see is what you get.
Software development will then continue in pre
Production units for as long as required to do so.
Therefore: prototype status = pre production